• MULTI-STAGE TRIPOD JACK PROCEDURE
    • 83

    MULTI-STAGE TRIPOD JACK PROCEDURE

    Aircraft Jack Maintenance & Proof Load Testing Multi-Stage Tripod Jack Procedure 90 Day Maintenance Procedure: Check leaks including the following areas of the hydraulic system: – Hydraulic lines (hoses and fittings) – Hand pump (cylinder, fittings and seals) – Reservoir (welds and fittings) – Air operated pump ( fittings, air side and oil side seals)

  • SINGLE-STAGE TRIPOD JACK
    • 71

    SINGLE-STAGE TRIPOD JACK

    Aircraft Jack Maintenance & Proof Load Testing Single-Stage Tripod Jack Procedure 90 Day Maintenance Procedure: Check leaks including the following areas of the hydraulic system: – Hydraulic lines (hoses and fittings) – Hand pump (cylinder, fittings and seals) – Reservoir (welds and fittings) – Air operated pump (fittings, air side and oil side seals) Inspect

  • AXLE JACK PROCEDURE
    • 137

    AXLE JACK PROCEDURE

    Aircraft Jack Maintenance & Proof Load Testing Axle Jack Procedure 90 Day Maintenance Procedure: Check leaks including the following areas of the hydraulic system: – Hand pump (cylinder, fittings and seals) – Reservoir (welds and fittings) Inspect the Jack structure for corrosion, bending, cracking and excessive wear in the following areas: – Base plate –

Categories

NOT A MEMBER?

Sign up today to become an instant member and start becoming an industry knowledge leader!

SIGN UP!
MOST VIEWED
© Copyright 2017 e2b calibration