• MULTI-STAGE TRIPOD AIRCRAFT JACK MAINTENANCE PROCEDURE
    • 143

    MULTI-STAGE TRIPOD AIRCRAFT JACK MAINTENANCE PROCEDURE

    Aircraft Jack Maintenance & Proof Load Testing Multi-Stage Tripod Jack Procedure 90 Day Maintenance Procedure: Check leaks including the following areas of the hydraulic system: - Hydraulic lines (hoses and fittings) - Hand pump (cylinder, fittings and seals) - Reservoir (welds and fittings) - Air operated pump ( fittings, air side and oil side seals)
  • SINGLE-STAGE TRIPOD AIRCRAFT JACK MAINTENANCE PROCEDURE
    • 117

    SINGLE-STAGE TRIPOD AIRCRAFT JACK MAINTENANCE PROCEDURE

    Aircraft Jack Maintenance & Proof Load Testing Single-Stage Tripod Jack Procedure 90 Day Maintenance Procedure: Check leaks including the following areas of the hydraulic system: - Hydraulic lines (hoses and fittings) - Hand pump (cylinder, fittings and seals) - Reservoir (welds and fittings) - Air operated pump (fittings, air side and oil side seals) Inspect
  • AIRCRAFT AXLE JACK MAINTENANCE PROCEDURE
    • 218

    AIRCRAFT AXLE JACK MAINTENANCE PROCEDURE

    Aircraft Axle Jack Maintenance & Proof Load Testing Axle Jack Procedure 90 Day Maintenance Procedure: Check leaks including the following areas of the hydraulic system: - Hand pump (cylinder, fittings and seals) - Reservoir (welds and fittings) Inspect the Jack structure for corrosion, bending, cracking and excessive wear in the following areas: - Base plate

Categories

NOT A MEMBER?

Sign up today to become an instant member and start becoming an industry knowledge leader!

SIGN UP!
MOST VIEWED
© Copyright 2017 e2b calibration